Skip to content
Concept demo

A fictional brand, designed and built by Get Ranked On Top. Not a real company.

Force 0Calm0–0.5 m/sTurbines idle

Sea like a mirror.

Offshore wind · Gdańsk · since 2016

Every gust off the Baltic, put to work.

Baltrow Wind builds and runs offshore wind farms in the Polish Baltic. Sixty-four turbines are turning 38 km off the coast today, two more farms are on the way, and every one of them is looked after from the port of Gdańsk.

megawatts turning today
960
terawatt-hours in a typical year
4.0
Polish homes' worth of power
1,820,000
kilotonnes of CO₂ kept out of the air each year
2,760

The wind picks up as you scroll.

Force 1Light air0.5–1.5 m/sTurbines idle

Ripples like scales, no foam crests.

It started with a weather log.

In 2016 two engineers parked a caravan on the Hel peninsula and logged the wind every ten minutes for a year. The numbers were better than anyone in Warsaw believed: a mean of 9.6 m/s at hub height, from the west, most of the year.

Ten years on, that log is a 960 MW farm, a crew of 412 people and a port base that sends technicians out before most of Gdańsk is awake. We still keep the log. We still read the weather first.

We don't sell electricity, really. We sell the weather, delivered on time.

Agata Morawiec, co-founder and CEO
  • Built in the Baltic

    Foundations rolled in Szczecin, cables landed at Choczewo, towers painted in Gdańsk. Forty-one percent of what we spend stays in Poland.

  • Run from the port

    Our control room, warehouse and four crew boats sit on one quay. A fault at 03:00 has a technician on a ladder by breakfast.

  • Here for thirty years

    A farm is a thirty-year promise to the sea and the people who work it. We plan for decommissioning on day one.

Force 2Light breeze1.6–3.3 m/sTurbines idle

Small wavelets; crests look glassy and do not break.

Three farms, one horizon.

Our concession runs north of the Pomeranian coast, where the water is shallow enough for monopiles and the wind rarely drops. One farm is turning, one is being built, one has its permits.

B1B2B3GdańskGdyniaHelO&M baseBaltic Sea38 km
3,192 MW across the three farms
  • Baltrow I

    Operating

    Turning since 2025

    Our first farm and still the one we learn most from. Its monopiles have grown mussel reefs, its cables run to a substation at Choczewo, and its availability has not dropped below 97% since commissioning.

    Turbines
    64
    Each
    15 MW
    Capacity
    960 MW
    Offshore
    38 km
    Water depth
    28–41 m
    Rotor
    236 m
  • Baltrow II

    Under construction

    First power 2028

    Fifty-eight 18 MW machines on the same grid connection. Foundations went in this summer; the first turbine is due on its tower in spring 2027.

    Turbines
    58
    Each
    18 MW
    Capacity
    1,044 MW
    Offshore
    44 km
    Water depth
    33–46 m
    Rotor
    260 m
  • Baltrow III

    Consented

    Construction from 2031

    The deepest and farthest of the three. Environmental decision issued, seabed survey complete, grid contract signed. We start building in 2031.

    Turbines
    66
    Each
    18 MW
    Capacity
    1,188 MW
    Offshore
    61 km
    Water depth
    36–52 m
    Rotor
    260 m

Force 3Gentle breeze3.4–5.4 m/sFarm at 4% of rated power

Large wavelets; crests begin to break, scattered white horses.

Turn up the wind.

Drag the wind speed and watch the turbine respond. Below 3 m/s it waits; up to 11 m/s power climbs with the cube of the wind; above 25 m/s it parks itself and rides the storm out.

Force 5 · Fresh breeze

Sea state: Moderate waves, many white horses, a chance of spray.

Farm
Per turbine
9.9 MW66% of rated
Whole farm, now
631 MW66% of rated · 960 MW
homes' worth of power
2,513,000
If it blew like this all year
5.5 TWhTypical year for Baltrow I: 4.0 TWh
Rotor
7.6 rpm

Climbing the curve: power grows with the cube of the wind.

12345678910110%50%100%051015202530Cut-inRatedCut-outWind speed, m/sPower

A simplified model: one power curve for every turbine, no wake losses or downtime. Real output varies with the weather, as it should.

Force 4Moderate breeze5.5–7.9 m/sFarm at 21% of rated power

Small waves growing longer; fairly frequent white horses.

How a farm goes up.

Nine years from the first wind buoy to the first megawatt-hour, then thirty years at sea. This is how Baltrow I was built, and how its two neighbours will be.

  1. Read the sea

    Two floating LiDAR buoys and a seabed survey ship map the wind, waves and ground for two full winters.

    2 winters of data24 months

  2. Earn the permits

    Environmental decision, location permit, grid agreement, a contract for difference. The longest leg of the journey.

    1,400 pages of environmental report42 months

  3. Drive the foundations

    Steel monopiles 9.5 m wide are hammered 40 m into the seabed, with bubble curtains to spare the porpoises.

    64 monopiles9 months

  4. Lay the cables

    66 kV array cables link the turbines; two 220 kV export cables come ashore under the dunes at Choczewo.

    98 km of cable7 months

  5. Raise the turbines

    A jack-up vessel stands on the seabed and lifts tower, nacelle and blades. One turbine every 36 hours in good weather.

    64 turbines8 months

  6. Thirty years at sea

    Then the real work: servicing, inspecting, repowering and, one day, taking it all home again.

    A 30-year commitment

Force 5Fresh breeze8–10.7 m/sFarm at 61% of rated power

Moderate waves, many white horses, a chance of spray.

Run from the port of Gdańsk.

Every turbine reports its wind, pitch and temperature to our control room every second. When one needs a hand, a crew boat leaves the quay within the hour.

  • B1-018.2 m/s · 6.0 MW
  • B1-0810.3 m/s · 12.3 MW
  • B1-1510.1 m/s · 11.5 MW
  • B1-2210.1 m/s · 11.5 MW
  • B1-299.9 m/s · 10.9 MW
  • B1-369.7 m/s · 10.2 MW
  • B1-439.7 m/s · 10.2 MW
  • B1-509.5 m/s · 9.6 MW
  • B1-5711.6 m/s · 15.0 MW
  • B1-649.3 m/s · 8.9 MW
  • B1-079.1 m/s · 8.4 MW
  • B1-1411.2 m/s · 15.0 MW
  • B1-218.9 m/s · 7.8 MW
  • B1-2811.0 m/s · 15.0 MW
crew transfer vessels
4
Foka, Mewa, Kormoran and Rybitwa
service operation vessel
1
Sztorm stays at the farm for two-week rotations
offshore technicians
96
GWO-certified, most of them from Pomerania
hours to reach a fault
2.4
average, from alarm to technician on the ladder
minutes quay to farm
95
at 25 knots in a moderate sea
availability since 2025
97.6%
share of hours a turbine was ready to run

Control room staffed 24 hours a day, 365 days a year.

Force 6Strong breeze10.8–13.8 m/sFarm at full power

Large waves begin to form; white foam crests everywhere.

Sharing the sea.

A wind farm is 131 square kilometres of somebody's fishing grounds, a bird flyway and a porpoise nursery. We'd rather earn our place there than argue for it.

  • Fishers first

    A full-time fisheries liaison, compensation agreed with the Władysławowo and Ustka associations, and passive gear allowed between turbines.

  • Birds have right of way

    Bird radar watches the autumn migration. On heavy nights we slow the rotors; last year that cost us 0.3% of output.

  • Reefs on the monopiles

    Scour rock at each foundation has become home to mussels, cod and flatfish. Divers count them every September.

  • A fund for the coast

    Every year PLN 4,800,000 goes to coastal schools, lifeboat crews and harbour clubs in the gminas facing the farm.

I was against it. Now my son services the turbines and I still fish the same grounds, only with more cod.

Piotr Szulc, skipper, Władysławowo

Certified to

  • ISO 14001
  • ISO 45001
  • ISO 55001
  • GWO

Force 7Near gale13.9–17.1 m/sFarm at full power

Sea heaps up; foam from breaking waves blows in streaks.

Some of our best days start in a near gale.

We hire people who like weather, ladders and doing a job properly the first time. Training, sea survival and GWO certification are on us.

  • Paid GWO and sea-survival training
  • Helicopter-free commute: boats only
  • Family day at the farm every June

Force 8Gale17.2–20.7 m/sFarm at full power

Moderately high waves; crests break into spindrift.

Questions people ask us.

What happens to the turbines in a storm?

At 25 m/s (force 10) they pitch their blades edge-on to the wind, brake and park. They are built for gusts of 70 m/s. When the wind drops back, they restart on their own.

Can you see the farm from the beach?

Only just. At 38 km the blade tips sit on the horizon on a clear day, a row of white matchsticks. At night the red aviation lights are dimmed unless a plane comes near.

Can fishing boats still work in the farm?

Yes, with passive gear such as nets and pots, outside the 50 m safety zone around each turbine. Trawling stays outside the array for cable safety.

Who buys the electricity?

It goes into the national grid through the Choczewo substation. A 25-year contract for difference sets a fixed price, so neither we nor the bill-payer gamble on the wholesale market.

How can my company become a supplier?

Register in our supplier portal with your capabilities and certificates. We publish every tender over 500,000 zł and hold two open days a year in Gdańsk.

What happens after thirty years?

Either we repower with new turbines on the same grid connection, or we remove everything down to the seabed and recycle it. The money for that is set aside from year one.

Force 9Strong gale20.8–24.4 m/sFarm at full power

High waves, dense streaks of foam; spray cuts visibility.

Talk to the people who read the wind.

Suppliers, fishers, job-seekers, investors, journalists: tell us who you are and the right person will reply within two working days.

Head office

ul. Chmielna 101
80-748 Gdańsk

Mon–Fri, 08:00–17:00

+48 58 300 41 00
kontakt@baltrow.example

O&M base

Nabrzeże Przemysłowe 4, 80-542 Gdańsk

Marine coordination, 24/7
+48 58 300 41 99

suppliers@baltrow.example

Send an enquiry

I'm getting in touch as

Force 10Storm24.5–28.4 m/sTurbines parked

Very high waves with long, overhanging crests; the sea turns white.

Baltrow Wind

At force 10 we park the turbines, tie down the boats and go home. Everything else, we work through.

© 2026 Baltrow Wind sp. z o.o. · Gdańsk

Baltrow Wind is a fictional company created for a design concept. Its farms, vessels, people and figures are invented.

Back to calm