Skip to content
Concept demo

A fictional brand, designed and built by Get Ranked On Top. Not a real company.

Sheet A-00Urban ropeway engineering · Medellín · since 2004

The shortest way up the hill is a straight line.

We design, build and keep running the cable cars that carry Medellín’s hillside neighbourhoods to the metro: twelve minutes in the air instead of an hour on the road.

Valley station · 1,478 mHill station · 1,942 m
Project
Urban ropeways
Scale
1 : 2500
Drawn
2004–2026
lines designed and in service
14
kilometres of rope in the air
61
riders a day across our lines
182,000
availability across the network in 2025
99.6%

Sheet A-01Scope of work

One firm from the first survey to the ten-thousandth day of service.

Cities rarely buy a cable car twice, so we stay with each line for its whole life: we draw it, build it with the community, and keep it turning.

  1. Route & feasibility studies

    Ridership counts, terrain survey, three alignments compared on cost, travel time and how many homes each one passes over.

    6 weeks
  2. Line design

    Spans, tower heights and positions, rope and drive selection, wind and clearance checks, to European cableway standards.

    Engineering
  3. Stations that belong

    Stations that double as plazas, libraries and bus interchanges, designed with the architects and the people who will use them.

    Architecture
  4. Foundations on steep ground

    Micropiles and anchored footings on slopes of up to 45°, built with small crews and without closing a single street for long.

    Civil works
  5. Commissioning & certification

    Load tests, evacuation drills and the independent inspections that get a line open on the date the mayor announced.

    Opening
  6. Operation & maintenance

    Night maintenance windows, rope inspections, spare cabins and a control room that watches every line we run.

    24/7

Fixed-fee route study

From US$85,000, delivered in 6 weeks: three alignments, ridership forecast, tower plan and an indicative budget.

Start with a route study

Sheet A-02Cabin systems

Three cabins, drawn to scale.

The cabin decides everything else: how many people per hour, how far the ropes can span, how tall the towers stand. These are the three we build most.

  • 1.9 m2.3 m

    Detachable monocable

    8-seat gondola

    The workhorse of hillside lines: light towers, small stations, cabins every twelve seconds.

    Seats
    8
    Line speed
    6 m/s
    Per hour, each way
    up to 2,400
    Longest span
    340 m
  • 2.1 m2.4 m

    Detachable monocable

    10-seat gondola

    Room for prams, wheelchairs and bikes, with a cabin every ten seconds at peak.

    Seats
    10
    Line speed
    6 m/s
    Per hour, each way
    up to 3,600
    Longest span
    380 m
  • 3.9 m2.9 m

    Tricable 3S

    35-seat cabin

    Two track ropes and a haul rope: spans of over a kilometre, steady in strong wind.

    Seats
    35
    Line speed
    7.5 m/s
    Per hour, each way
    up to 6,000
    Longest span
    1,300 m

Sheet A-03Route planner

Sketch your own line.

This is the slope we model most often: the valley floor at the metro, up to a ridge three kilometres away. Place the stations, choose a cabin, and watch the rope find its towers.

1,5001,6001,7001,8001,900mABC2,743 m

Patayong scale ×2.2Tap the slope to move the selected station there.

Cabin
Stations

Your line

Line length
2.74 km
End to end
8.5 min
Per hour, each way
3,600
Towers
7
Vertical rise
424 m
Cabins in the loop
117
Indicative budget
US$87 million

2.74 km, 8.5 min, 3,600 per hour each way, 7 towers.

Sheet A-04Lines in service

Four of our fourteen lines.

Each one replaced a bus ride up streets too steep and too narrow for anything bigger than a jeep.

  • Opened 2011

    Cable Guayacán

    From the river to the northern ridge

    Our first line and still our busiest: 31,000 riders on a weekday, most of them on their way to work or school.

    Length
    2,740 m
    Towers
    19
    Ride
    9.5 min
    System
    10-seat gondola
  • Opened 2016

    Línea Balcones

    A short climb, a big change

    Under a kilometre and a half, but it turned a 40-minute walk up 600 steps into five minutes sitting down.

    Length
    1,460 m
    Towers
    11
    Ride
    5.2 min
    System
    8-seat gondola
  • Opened 2021

    Teleférico Arrayanes

    Long spans over the ravine

    A tricable line with six towers in four kilometres, crossing a protected ravine without touching it.

    Length
    4,120 m
    Towers
    6
    Ride
    11.8 min
    System
    35-seat cabin
  • Opened 2025

    Cable Mirador Oriente

    Our newest, opened in March

    Four stations, one of them a public library, and the first line in the city with step-free boarding at every door.

    Length
    2,210 m
    Towers
    15
    Ride
    8.1 min
    System
    10-seat gondola

Plan a line like these

Sheet A-05From survey to opening

Five stages, about two years.

A cable car is quick to build compared with a road or a tram. Most of the time goes into listening first.

  1. 6 weeks

    Walk the hill

    Surveyors, engineers and the neighbourhood’s own leaders walk every possible alignment together.

  2. 10 weeks

    Choose the route

    Three options on the table, compared openly in community meetings before one is drawn in detail.

  3. 24 weeks

    Draw it

    Detailed design of towers, stations and drives, and the permits that go with them.

  4. 60 weeks

    Build it

    Foundations by hand where trucks can’t reach, towers lifted in by crane or helicopter, ropes pulled in a single week.

  5. 12 weeks

    Open it

    Load tests with water ballast, rescue drills, independent inspection, and a first ride for the people who live under the line.

Sheet A-06Safety & proof

Built to be boring.

A good ropeway is the least exciting ride in the city. These are the numbers we are proudest of.

  • Availability

    99.6%

    of scheduled hours across all lines we operate in 2025.

  • Passenger injuries

    0

    on our lines in twenty-two years of service.

  • Rescue drill

    90 min

    to bring every passenger down if a line ever stopped for good. We drill it twice a year.

  • Standards

    EN

    Every line is designed and inspected to the European cableway standards, then certified locally.

4.9 out of 5 from 37 client reviews

  • They walked the hill with us before they drew a single line. Not one family had to move for the towers.

    Beatriz Ocampo · community leader, Los Robles
  • Opened on the day we promised, and in four years it has stopped for wind twice, each time for under an hour.

    Hernán Villegas · operations director, a municipal transit authority
  • My mother used to take two buses to the clinic. Now she rides the cable car and is home before lunch.

    Daniela, rider on Cable Guayacán

Sheet A-07The studio

Forty-six engineers who grew up on hillsides.

Altiva started in 2004 in a rented room above a hardware shop, with two engineers and a single question: why does the city build roads up slopes that only a rope can climb?

Today we are forty-six people in Medellín: civil, mechanical and electrical engineers, architects, surveyors and a community team that is on the hill before anyone else.

  • Ingrid Salazar Mejía

    Founding partner · Line design

    Drew our first line by hand. Still checks every span table before it leaves the studio.

  • Tomás Echeverri Gil

    Ropes & drives

    Has spliced more than forty kilometres of haul rope and teaches the craft to every new crew.

  • Yuliana Cardona Ruiz

    Community & routes

    Leads the hill walks. Knows which staircase every neighbourhood actually uses.

Sheet A-08Contact

Come and see the drawings.

Our studio is in El Poblado, ten minutes from a metro station and twenty from a cable car we built. Bring a map of your hill.

Altiva RopewaysCarrera 37 # 8A-12, El PobladoMedellín 050021

Studio hours

Monday–Friday
07:30–17:30
Saturday
08:00–12:00
Sunday & holidays
Closed
MetroMedellín RiverAltiva

Sheet A-09Questions

What cities ask us first.

How much does an urban cable car cost?

Roughly 20 to 45 million US dollars per kilometre, depending on the cabin system, the stations and the ground. A route study gives you a budget you can take to council.

How long until it opens?

About two years from the first survey, of which construction is a little over one. Ropes and cabins are made while the foundations go in.

Do people have to move for the towers?

Rarely. Towers need a footprint of about six by six metres, and we choose routes over roofs, ravines and streets so that homes stay where they are.

What happens in a power cut?

Every drive has a diesel back-up that brings all cabins into the stations at reduced speed. If that ever failed, crews can reach every cabin by rope within ninety minutes.

Can it carry wheelchairs and bikes?

Yes. Cabins slow to walking pace in the stations and the floors are level with the platform; ten-seat and larger cabins take a wheelchair or a bike with room to spare.

Do you only work in Medellín?

Most of our lines are in Colombia, and we have studies under way in two other Andean cities. Hillsides are where we are most useful.

Your hill, our straight line.

Send us the slope and the ridership you expect. We send back three routes in six weeks.

Plan a lineFree sketch