General contractor · Москва · Since 1998
Строим
надёжноWe build to last.
Severos Build designs, engineers and builds homes, offices, bridges and industrial plant across eleven regions. Our own frames, our own cranes, our own people — and a programme our clients can read every morning.
Workforce
6 800 on site
Own fleet
38 tower cranes
Design bureau
340 engineers
Live sites
23 in 2026
Заказчики / Built for
- Krasnaya Gorka Development
- Ostrov Logistics Parks
- Belyi Bereg
- SEVERNAYA DATA HALLS
- Mytnaya Medical Trust
- Pyatyi Kvartal
01 — Ключевые показатели / Key figures
Цифры, а не обещанияFigures, not promises
Every number on this page comes from our audited annual report and is restated each quarter. If one ever goes the wrong way, it stays here.
4.2млн м²
Delivered since 1998
Gross floor area handed over across 186 completed schemes in eleven regions.
186
Projects completed
From a 3,400 m² clinic to a 410,000 m² mixed-use district. 23 live today.
1 412days
Without a lost-time incident
Group-wide, all sites, all subcontractors. Counter last reset 4 Dec 2022.
96%
Handed over on or before date
Contractual completion achieved across the last 50 projects, independently audited.
02 — Отрасли / Sectors
Четыре отрасли. Один подрядчик.Four sectors. One contractor.
The same site discipline runs through a 48-storey tower and a 96 MW data campus: one safety system, one planning method, one team accountable for the date.
ЖильёResidential
High-rise and mid-rise housing, from monolithic towers to timber-hybrid courtyard blocks. Apartments are delivered with a 5-year structural warranty and a defects team that stays on site after keys.
- Delivered1.9 млн м²
- Apartments27 400
- Tallest48 floors
КоммерцияCommercial
Grade A offices, retail and hospitality. We take developers from stage-2 design through Cat A fit-out under one contract, with a fixed price agreed at 60% design development.
- Delivered1.1 млн м²
- Office towers14
- Avg. floor cycle6 days
ИнфраструктураInfrastructure
Transport interchanges, bridges, depots and utilities for regional authorities. Night possessions, live-traffic phasing and 24/7 monitoring are business as usual.
- Bridges22
- Track-side works64 km
- Depots7
ПромышленностьIndustrial
Logistics parks, cold stores, data halls and process plants. Tilt-up and precast frames let us enclose 40,000 m² sheds in under 20 weeks from slab.
- Delivered1.2 млн м²
- Data halls9 · 96 MW
- Sheds / yr11
Design & build
A single point of responsibility from planning consent to handover. Our 340-strong design bureau carries the design risk.
EPC / turnkey
Engineering, procurement and construction for plant, data halls and utilities, with performance guarantees at commissioning.
Construction management
Open-book trade packages for developers who want control of the supply chain and a contractor who manages it like a client.
03 — График / Live programme
График, который видноA programme you can read
This is the 78-week programme for Kvartal Sever, Tower B. Clients see it exactly as our site teams do. Drag today forward and watch the frame climb, the façade close and the floors light up.
Готовность / Complete
36%
Drag the yellow marker, or focus it and use the arrow keys, to scrub through the 78-week programme.
- 01ФундаментFoundation · 100% Complete
- 02КаркасFrame · 71% In progress
- 03ФасадEnvelope · 14% In progress
- 04ИнженерияMEP · 0% Scheduled
- 05ОтделкаFit-out · 0% Scheduled
- Foundation
- 212 bored piles, 1.6 m raft, 2-level basement
- Frame
- In-situ concrete core and flat slabs, 6-day floor cycle
- Envelope
- Unitised curtain wall, 1,840 panels, triple glazed
- MEP
- Risers, plant deck, BMS commissioning
- Fit-out
- Shell & core to Cat A, lobby, landscaping
04 — Объекты / Featured projects
Сданные объектыHanded over, and handing over
Six of 186. Every project below was delivered under a single Severos contract, with our own frame and our own site leadership.
- 01
Kvartal Sever, Tower B48-storey residential tower, 612 apartments over a two-level podium
On site - 02
Ostrov Park 3Cross-dock logistics campus with 18 m clear height and 212 dock doors
Handed over - 03
Pyatnitsky CourtGrade A office refurbishment behind a retained 1912 street façade
Handed over - 04
Yauza CrossingCable-stayed pedestrian and cycle bridge, 186 m main span
On site - 05
Severnaya DC-224 MW Tier III data hall with on-site substation and fuel farm
Handed over - 06
Belyi Bereg ResidencesFour courtyard blocks, nursery, school and 1.2 ha park
Handed over
05 — Безопасность и качество / Safety & quality
Каждый идёт домойEveryone goes home
Safety is the first line of every programme review and the first item at every board meeting. These are the standards we hold ourselves to, and publish.
Site board · Updated 06:00 daily
Days without a lost-time incident · Дней без происшествий
Семь правил
Seven golden rules
Stop-work authority for every person on site, from day-one labourer to project director. Used 214 times last year; never once questioned.
Допуск онлайн
Digital permit-to-work
Hot works, lifts over 5 t, confined space and work at height are permitted through tablets, with photos, gas readings and a named supervisor.
Высота
Height without harm
Edge protection is installed before slab pour, not after. Perimeter screens climb with the core on every building over 12 floors.
Краны
Lifting plan for every lift
Anti-collision systems on all tower cranes, wind monitoring at the jib tip, and a lift supervisor signing off each critical lift.
Аудит
Independent quarterly audit
An external engineer audits every live site each quarter against our quality and safety management system. Results go to the board unedited.
Экология
Measured, not promised
Embodied carbon is tracked per m² from stage 2. 91% of site waste diverted from landfill across 2025; target 95% by 2027.
06 — Отзывы / Clients
Слово заказчикаIn our clients' words
71% of our order book comes from clients who have built with us before. Here is why three of them came back.
“Tower B is the third building they have topped out for us ahead of programme. We stopped asking for weekly reports — the live programme tells us more.”
“They priced the façade risk honestly at tender, then carried it. On a retained 1912 frontage that is worth more than any discount.”
“Night possessions on a live embankment, 140 of them, and not one overrun. Their logistics plan is the one we now ask other contractors to match.”
07 — Карьера / Careers
Стройте с намиBuild with us
6,800 people on site and 1,100 in our offices. Half of our project directors started here as graduates or apprentices.
We promote from site. Every manager spends their first year next to a foreman, and every engineer gets a mentor and a budget for chartership.
- Graduate programme: three site rotations in 24 months
- Paid professional chartership and RU/EN technical English
- Rotational roles with travel and accommodation covered
- Private medical cover for employees and families
Senior Site Manager
SB-0912Kvartal Sever, Moscow
Full-time · Site
Apply for Senior Site ManagerLead Planner, P6
SB-0917Head office, Moscow
Full-time · Hybrid
Apply for Lead Planner, P6BIM Coordinator
SB-0921Design bureau, Moscow
Full-time · Hybrid
Apply for BIM CoordinatorTower Crane Operator
SB-0930Ostrov Park 4, Oblast
Rotational · Site
Apply for Tower Crane OperatorHSE Advisor
SB-0934Yauza Crossing, Moscow
Full-time · Site
Apply for HSE AdvisorGraduate Engineer 2027
SB-GRADRotations across 3 sites
24-month programme
Apply for Graduate Engineer 2027
08 — Тендеры / Tenders
Пригласите насInvite us to tender
Tell us about the site and the date that matters. A named bid manager replies within two working days.
- Head office
- Severny proyezd 12, block 3
Moscow 000000 - Switchboard
- +00 000 000 1998
- Site hotline
- 24/7 safety and neighbour line · +00 000 000 0112
09 — Вопросы / FAQ
Частые вопросыQuestions we are asked
Straight answers to the things developers, funds and authorities ask before they invite us to bid.
What size of project do you take on?
Our sweet spot is 20,000 to 150,000 m² of gross floor area, or civil works from 1.5 to 40 billion roubles. We will tender smaller schemes for repeat clients, and we joint-venture above that range.
Can we bring you in before planning consent?
Yes, and we recommend it. Under early contractor involvement we join at concept stage for a fixed fee, test buildability and cost every fortnight, and you keep the option to go to open tender afterwards.
How do you price — fixed or open-book?
Both. Design & build contracts are lump sum at 60% design development with an agreed risk register. Construction management is open-book with a fixed fee and a shared-savings mechanism.
Do you self-deliver or subcontract?
We self-deliver the frame, core and groundworks with our own 2,100 operatives and plant, including 38 tower cranes. Façades, MEP and fit-out are let to a vetted supply chain that we manage directly.
What does a live programme give the client?
Read access to the same programme our site teams use, updated nightly from site diaries and drone surveys: percent complete per trade, look-ahead risks and a two-week lift schedule.
How quickly will you respond to a tender invitation?
We confirm intent to bid within two working days and return a pre-qualification pack within five. Full tenders typically take four to eight weeks depending on design maturity.