Skip to content
Concept demo

A fictional brand, designed and built by Get Ranked On Top. Not a real company.

General contractor · Москва · Since 1998

Строим
надёжноWe build to last.

Severos Build designs, engineers and builds homes, offices, bridges and industrial plant across eleven regions. Our own frames, our own cranes, our own people — and a programme our clients can read every morning.

GRID A/1 · +0.000+29.7 mLEVEL / УРОВЕНЬ09/ 16

Workforce

6 800 on site

Own fleet

38 tower cranes

Design bureau

340 engineers

Live sites

23 in 2026

Заказчики / Built for

  • Krasnaya Gorka Development
  • Ostrov Logistics Parks
  • Belyi Bereg
  • SEVERNAYA DATA HALLS
  • Mytnaya Medical Trust
  • Pyatyi Kvartal

01 — Ключевые показатели / Key figures

Цифры, а не обещанияFigures, not promises

Every number on this page comes from our audited annual report and is restated each quarter. If one ever goes the wrong way, it stays here.

4.2млн м²

Delivered since 1998

Gross floor area handed over across 186 completed schemes in eleven regions.

186

Projects completed

From a 3,400 m² clinic to a 410,000 m² mixed-use district. 23 live today.

1 412days

Without a lost-time incident

Group-wide, all sites, all subcontractors. Counter last reset 4 Dec 2022.

96%

Handed over on or before date

Contractual completion achieved across the last 50 projects, independently audited.

Revenue 2025 ₽ 148.6 bn
Order book ₽ 312 bn
LTIFR, per 1M hrs 0.09
Repeat clients 71%

02 — Отрасли / Sectors

Четыре отрасли. Один подрядчик.Four sectors. One contractor.

The same site discipline runs through a 48-storey tower and a 96 MW data campus: one safety system, one planning method, one team accountable for the date.

  • ЖильёResidential

    High-rise and mid-rise housing, from monolithic towers to timber-hybrid courtyard blocks. Apartments are delivered with a 5-year structural warranty and a defects team that stays on site after keys.

    • Delivered1.9 млн м²
    • Apartments27 400
    • Tallest48 floors
  • КоммерцияCommercial

    Grade A offices, retail and hospitality. We take developers from stage-2 design through Cat A fit-out under one contract, with a fixed price agreed at 60% design development.

    • Delivered1.1 млн м²
    • Office towers14
    • Avg. floor cycle6 days
  • ИнфраструктураInfrastructure

    Transport interchanges, bridges, depots and utilities for regional authorities. Night possessions, live-traffic phasing and 24/7 monitoring are business as usual.

    • Bridges22
    • Track-side works64 km
    • Depots7
  • ПромышленностьIndustrial

    Logistics parks, cold stores, data halls and process plants. Tilt-up and precast frames let us enclose 40,000 m² sheds in under 20 weeks from slab.

    • Delivered1.2 млн м²
    • Data halls9 · 96 MW
    • Sheds / yr11
01

Design & build

A single point of responsibility from planning consent to handover. Our 340-strong design bureau carries the design risk.

02

EPC / turnkey

Engineering, procurement and construction for plant, data halls and utilities, with performance guarantees at commissioning.

03

Construction management

Open-book trade packages for developers who want control of the supply chain and a contractor who manages it like a client.

03 — График / Live programme

График, который видноA programme you can read

This is the 78-week programme for Kvartal Sever, Tower B. Clients see it exactly as our site teams do. Drag today forward and watch the frame climb, the façade close and the floors light up.

GRID A/1 · +0.000+36.3 mLEVEL / УРОВЕНЬ11/ 16

Готовность / Complete

36%

WK 34 / 78

26 Oct 2026

Frame + Envelope

Drag the yellow marker, or focus it and use the arrow keys, to scrub through the 78-week programme.

  1. 01ФундаментFoundation · 100% Complete
    W0–14
  2. 02КаркасFrame · 71% In progress
    W10–44
  3. 03ФасадEnvelope · 14% In progress
    W30–58
  4. 04ИнженерияMEP · 0% Scheduled
    W36–68
  5. 05ОтделкаFit-out · 0% Scheduled
    W52–78
TODAY · W34
Foundation
212 bored piles, 1.6 m raft, 2-level basement
Frame
In-situ concrete core and flat slabs, 6-day floor cycle
Envelope
Unitised curtain wall, 1,840 panels, triple glazed
MEP
Risers, plant deck, BMS commissioning
Fit-out
Shell & core to Cat A, lobby, landscaping

04 — Объекты / Featured projects

Сданные объектыHanded over, and handing over

Six of 186. Every project below was delivered under a single Severos contract, with our own frame and our own site leadership.

  1. 01

    Kvartal Sever, Tower B48-storey residential tower, 612 apartments over a two-level podium

    86 400 м²Residential

    2027Moscow, Severny district

    On site
  2. 02

    Ostrov Park 3Cross-dock logistics campus with 18 m clear height and 212 dock doors

    142 000 м²Industrial

    2025Moscow Oblast, Ring 2

    Handed over
  3. 03

    Pyatnitsky CourtGrade A office refurbishment behind a retained 1912 street façade

    31 800 м²Commercial

    2024Moscow, Zamoskvorechye

    Handed over
  4. 04

    Yauza CrossingCable-stayed pedestrian and cycle bridge, 186 m main span

    186 m spanInfrastructure

    2026Moscow, Yauza embankment

    On site
  5. 05

    Severnaya DC-224 MW Tier III data hall with on-site substation and fuel farm

    18 600 м²Industrial

    2025Tver Oblast

    Handed over
  6. 06

    Belyi Bereg ResidencesFour courtyard blocks, nursery, school and 1.2 ha park

    104 500 м²Residential

    2023Kazan, riverside

    Handed over

05 — Безопасность и качество / Safety & quality

Каждый идёт домойEveryone goes home

Safety is the first line of every programme review and the first item at every board meeting. These are the standards we hold ourselves to, and publish.

Site board · Updated 06:00 daily

Days without a lost-time incident · Дней без происшествий

0.09LTIFR per million hours worked, 2025
38 200Toolbox talks recorded last year
100%Workers inducted before first shift
214Stop-work calls raised, all supported
  • Семь правил

    Seven golden rules

    Stop-work authority for every person on site, from day-one labourer to project director. Used 214 times last year; never once questioned.

  • Допуск онлайн

    Digital permit-to-work

    Hot works, lifts over 5 t, confined space and work at height are permitted through tablets, with photos, gas readings and a named supervisor.

  • Высота

    Height without harm

    Edge protection is installed before slab pour, not after. Perimeter screens climb with the core on every building over 12 floors.

  • Краны

    Lifting plan for every lift

    Anti-collision systems on all tower cranes, wind monitoring at the jib tip, and a lift supervisor signing off each critical lift.

  • Аудит

    Independent quarterly audit

    An external engineer audits every live site each quarter against our quality and safety management system. Results go to the board unedited.

  • Экология

    Measured, not promised

    Embodied carbon is tracked per m² from stage 2. 91% of site waste diverted from landfill across 2025; target 95% by 2027.

06 — Отзывы / Clients

Слово заказчикаIn our clients' words

71% of our order book comes from clients who have built with us before. Here is why three of them came back.

“Tower B is the third building they have topped out for us ahead of programme. We stopped asking for weekly reports — the live programme tells us more.”

Irina VolkonskayaDevelopment Director, Krasnaya Gorka Development

“They priced the façade risk honestly at tender, then carried it. On a retained 1912 frontage that is worth more than any discount.”

Mark Aldous-PetrovHead of Projects, Pyatyi Kvartal

“Night possessions on a live embankment, 140 of them, and not one overrun. Their logistics plan is the one we now ask other contractors to match.”

Dina SabirovaProgramme Lead, regional transport authority

07 — Карьера / Careers

Стройте с намиBuild with us

6,800 people on site and 1,100 in our offices. Half of our project directors started here as graduates or apprentices.

We promote from site. Every manager spends their first year next to a foreman, and every engineer gets a mentor and a budget for chartership.

  • Graduate programme: three site rotations in 24 months
  • Paid professional chartership and RU/EN technical English
  • Rotational roles with travel and accommodation covered
  • Private medical cover for employees and families

08 — Тендеры / Tenders

Пригласите насInvite us to tender

Tell us about the site and the date that matters. A named bid manager replies within two working days.

Head office
Severny proyezd 12, block 3
Moscow 000000
Switchboard
+00 000 000 1998
Site hotline
24/7 safety and neighbour line · +00 000 000 0112

Tender documents up to 2 GB are exchanged through our secure data room after NDA. We reply within two working days.

09 — Вопросы / FAQ

Частые вопросыQuestions we are asked

Straight answers to the things developers, funds and authorities ask before they invite us to bid.

What size of project do you take on?

Our sweet spot is 20,000 to 150,000 m² of gross floor area, or civil works from 1.5 to 40 billion roubles. We will tender smaller schemes for repeat clients, and we joint-venture above that range.

Can we bring you in before planning consent?

Yes, and we recommend it. Under early contractor involvement we join at concept stage for a fixed fee, test buildability and cost every fortnight, and you keep the option to go to open tender afterwards.

How do you price — fixed or open-book?

Both. Design & build contracts are lump sum at 60% design development with an agreed risk register. Construction management is open-book with a fixed fee and a shared-savings mechanism.

Do you self-deliver or subcontract?

We self-deliver the frame, core and groundworks with our own 2,100 operatives and plant, including 38 tower cranes. Façades, MEP and fit-out are let to a vetted supply chain that we manage directly.

What does a live programme give the client?

Read access to the same programme our site teams use, updated nightly from site diaries and drone surveys: percent complete per trade, look-ahead risks and a two-week lift schedule.

How quickly will you respond to a tender invitation?

We confirm intent to bid within two working days and return a pre-qualification pack within five. Full tenders typically take four to eight weeks depending on design maturity.