Step 00Bespoke staircase joinery · Riga · since 2009
Stairs drawn to the millimetre, built to outlast the house.
We measure your opening, draw every riser and tread, then cut, joint and fit the stair ourselves from Latvian birch and oak. One workshop on the left bank of the Daugava, one team from first sketch to last coat of oil.
- stairs drawn, built and fitted
- 640
- our cutting tolerance on every tread
- ±0.5 mm
- years of guarantee on every glued joint
- 25
- average from 212 client reviews
- 4.9
Step 01Four ways up
Pick the climb first. We'll draw the rest around it.
Every Risewell stair starts from the same three numbers: how high you need to go, how much floor you can give up, and how the stair should feel underfoot. The shape follows from those.
Straight flight
One honest run from floor to floor. The easiest stair to climb and to carry furniture up, and the one that shows off a single long stringer of solid birch.
Needs about 3.5 m of floor
from €4,9007 weeks in the workshopQuarter-turn winder
Three tapered treads take the corner, so a stair that would need a landing fits against two walls. We set out the walking line so every step feels the same.
Fits in about 2.5 × 1.5 m
from €7,4009 weeks in the workshopSpiral
Treads fanned around a laminated birch column, for lofts, galleries and the attic you never use because the ladder is a nuisance. Every turn keeps two metres of headroom.
From 1.3 m across
from €8,90011 weeks in the workshopFloating cantilever
Solid treads anchored into a masonry or steel-reinforced wall, with nothing underneath but light. Our most demanding drawing and our most asked-about stair.
Needs a structural wall
from €11,80012 weeks in the workshop
Step 02The calculator
Enter two numbers. Get a stair you can climb.
Floor-to-floor height and the run you can spare are all we need to work out risers, rise and going, and to check the pitch against the limits we design every domestic stair to. Change the type and the drawing redraws itself.
- Risers
- 15
- Treads
- 14
- Rise
- 186 mm
- Going
- 262.9 mm
- Pitch
- 35.3°
- 2R + G
- 635 mm
- Walking line
- 3,680 mm
- Stair width
- 900 mm
Checked against domestic-stair limits
- RiseBetween 150 and 190 mmPass
- GoingAt least 250 mmPass
- Stride (2R + G)In the 600–650 mm comfort bandPass
- PitchNo steeper than 42°Pass
- Flight16 risers or fewer in one flightPass
Estimate
€6,150 – €7,500
- 7 weeks from drawing to fitting
- 4.5 m of balustrade
Drawn, made, fitted and oiled in Riga, VAT included. The final price follows a free site measure.
Step 03Timber and finish
Birch from Vidzeme, oak from the Baltic, oil from our own bench.
Nine in ten of our treads come from forests within a day's drive of the workshop. We buy boards, not panels, and season them in the workshop for six weeks before the first cut.
Vidzeme
Latvian birch
Pale, close-grained and quietly tough. Our signature, and the timber we laminate our spiral columns from.
- Hardness
- 5,500 N
- Price
- Our base price
Latgale
Ash
Lively grain with a slight spring to it. Takes a white oil beautifully for a Nordic, chalky finish.
- Hardness
- 6,000 N
- Price
- +18% on birch
Kurzeme and Lithuania
White oak
The classic. Dense, stable and forgiving of boots, dogs and decades of daily climbing.
- Hardness
- 6,000 N
- Price
- +32% on birch
Kurzeme
Smoked oak
Oak darkened right through in an ammonia chamber, so a chipped nosing stays the same colour as the rest.
- Hardness
- 6,000 N
- Price
- +50% on birch
Three finishes
Hard-wax oil
Matt, warm and repairable in an afternoon. Our default.
White oil
Keeps birch and ash pale instead of ambering over the years.
Water-based lacquer
For stairs that see wet boots and a lot of traffic.
Step 04How a stair is made
Five steps, climbed in order.
Most stairs leave the workshop around five weeks after we first stand in your hallway with a laser and a notebook.
Site measure
We laser the opening, the floor levels and the walls, which are never as square as the plans say.
1 working day
Drawing
Plan, section and every tread to scale. You sign off a drawing, not a mood board.
6 working days
Workshop
Stringers routed, treads cut and jointed, every part numbered to the drawing.
18 working days
Dry-fit
The whole stair is assembled in the workshop, checked with a level and taken apart again.
2 working days
Fitting and oil
Two of us install it in one or two days, oil it, and leave the hallway cleaner than we found it.
2 working days
Step 05Selected work
Four recent climbs.
Every project gets a drawing number and keeps it. These are four from the last two years.
Spiral
Mežaparks villa
A smoked-oak spiral rising through a 1930s villa's stairwell, its column laminated from 21 layers of birch.
- Floor to floor
- 3,150 mm
- Risers
- 17
- Timber
- Smoked oak
- Fitted
- 2025
It's the first thing anyone touches when they come in.
Elīna V., owner
Straight flight
Kalnciema loft
A single birch flight under a skylight, with steel rods so thin the stair looks drawn in pencil.
- Floor to floor
- 2,790 mm
- Risers
- 15
- Timber
- Latvian birch
- Fitted
- 2025
They moved the stair 40 mm on the drawing so the skylight lines up. Nobody else would have noticed.
Roberts K., architect
Quarter-turn winder
Āgenskalns townhouse
A quarter-turn oak winder squeezed into a wooden townhouse where the old stair was more ladder than stair.
- Floor to floor
- 2,860 mm
- Risers
- 16
- Timber
- White oak
- Fitted
- 2024
Our children run up it. They never ran up the old one.
Sanita and Jānis P.
Floating cantilever
Jūrmala dune house
Floating ash treads cantilevered from a concrete wall, oiled white so they read like driftwood.
- Floor to floor
- 2,700 mm
- Risers
- 15
- Timber
- Ash
- Fitted
- 2024
Five weeks from the measure to standing on it.
Marta L., owner
Step 06Proof
Climbed every day, recommended every week.
The drawing showed exactly what we got, down to the screw caps on the rail.
Kristaps D., Teika
They told us honestly that a spiral would not work in our space and drew us a winder instead.
Ieva and Mārcis R., Sigulda
Fitted in a day and a half, oiled, swept. The dog approves too.
Anna S., Cēsis
Joint guarantee
25 years on every glued and wedged joint, transferable if you sell the house.
Millimetre tolerance
Treads are cut to ±0.5 mm, so the last step is as tall as the first.
Local timber
92% of our timber is grown in Latvia and sawn within 200 km of Riga.
Makers fit it
The people who built your stair are the ones who install it. No subcontractors.
Step 07The studio
Eleven people, one long bench, and a drawing office upstairs.
Risewell began in 2009 in a rented garage in Pārdaugava with one router, one van and a stubborn belief that a stair is the most-used piece of furniture in a house.
Today we draw, cut and fit around fifty stairs a year from a former sawmill shed by the river. Every stair is drawn by the person who will build it.
Inga Bērziņa
Founder and master joiner
Has climbed every stair we have made, usually twice, usually with a level.
Mārtiņš Kalniņš
Head of drawing
Turns crooked walls into straight lines. Trained as an architect, defected to timber.
Dace Liepa
Workshop lead
Runs the bench, the spray booth and the six-week seasoning schedule.
Step 08Visit the workshop
Climb a few of our stairs before you choose yours.
Our showroom is the workshop itself: three finished stairs to walk up and down, timber samples to take home, and coffee while we sketch your opening.
Zāģeru iela 7, Rīga, LV-1005Workshop hours
- Monday to Friday
- 08:00–17:00
- Saturday
- 10:00–14:00
- Sunday
- Closed
Talk to the drawing office
- Call
- +371 6711 4820
Free parking in the yard. Tram 2 to Zaķusala stop, then a four-minute walk.
Step 09Questions
Asked on almost every site measure.
How much floor space does a stair really need?
For a 2.8 m floor-to-floor height, a straight stair needs about 3.5 m of run, a quarter-turn winder about 2.5 by 1.5 m, and a spiral as little as 1.3 m across. The calculator above gives you a first answer; the site measure gives you the real one.
Do you replace stairs in old wooden houses?
Often. Pre-war Riga houses rarely have level floors or square walls, so we scribe every tread to the wall and build the new stair to the house you have, not the one on the plans.
What limits do you design to?
Every domestic stair we draw keeps the rise between 150 and 190 mm, the going at 250 mm or more (220 mm on the walking line of a spiral), a stride (2R + G) between 600 and 650 mm, and a pitch no steeper than 42°. Your architect or building board may add their own requirements; we work to the stricter of the two.
How long does it take?
Usually seven to twelve weeks from the site measure to the fitted stair, depending on the type and the timber. Fitting itself takes one or two days.
Can the stair go in before the floors are finished?
Yes, and it often should. We fit a protected stair early, wrap the treads, and come back to oil it after the floors are done at no extra cost.
Do you work outside Riga?
Across Latvia, and in Estonia and Lithuania for larger projects. Site measures within 100 km of Riga are free.
Step 10Upper floor
Your stair starts with one measurement.
Try your numbers in the calculator, then book a free site measure. We'll bring the laser, the timber samples and a sharp pencil.