1LC-1 Matarau Point
- Azimuths
- 165° – 200°
- Inclinations
- 97° – 110° SSO / polar
- Flights
- 23
- Turnaround
- 9 days, record 6 d 14 h
A fictional brand, designed and built by Get Ranked On Top. Not a real company.
● Mission log · Flight 42 in integration
Dedicated and rideshare launch for spacecraft up to 320 kg to sun-synchronous orbit. Two pads on the south coast, a nine-day turnaround, and a T-0 fixed the day you sign — not the week you ship.
Kite kick stage raises apogee after Tern stage 2 delivers a 185 km parking orbit.
Flying for
MERIDIAN ORBITALKōura EOTasman Spectrumhalcyon relayFARWATCH//Northgate Univ. CubeSat LabTern is built in-house at Hangar 3: tanks, engines, avionics and fairing. One configuration, flown the same way every time.
| Parameter | Value |
|---|---|
| Vehicle | Tern — two-stage, expendableAL-100 |
| Height / core diameter | 18.40 m / 1.17 m |
| Liftoff mass | 13,050 kg |
| Propellants | LOX / RP-1, both stages |
| Stage 1 | 9× Ember-1 · 226 kN SL · 152 s burn④⑤ |
| Stage 2 | 1× Ember-V · 26.4 kN vac · Isp 343 s · 2 relights② |
| Payload to LEO (185 km, 45°) | 420 kg |
| Payload to SSO (500 km) | 320 kg |
| GTO-transfer, with Kite kick stage | 60 kg |
| Injection accuracy | ±1.5 km altitude · ±0.02° incl. |
| Fairing usable envelope | Ø1.24 m × 2.10 m① |
| Max axial load / shock at sep. | 6.2 g / 1,000 g SRS |
| Pad turnaround | 9 days, either complex |
Callouts — refer Fig. 1
Two-piece carbon composite, acoustic blankets to 136 dB OASPL. Encapsulated horizontally, rolled out vertical.
Vacuum-optimised, two relights. Circularises, then performs a deorbit burn so nothing we fly stays in your orbit.
Pneumatic pushers, no pyrotechnics. Separation shock below 1,000 g at the payload interface.
Friction-stir welded aluminium-lithium tanks with a common bulkhead. 2,870 kg RP-1.
Electric-pump fed. Engine-out capable from T+22 s. Each one hot-fired twice before integration.
Every flight we have scheduled, with the capacity still open. Updated at each readiness review. Dates are NET, UTC.
11 of 11 missions
Two complexes, 38 minutes apart by road, facing open ocean. Southward for polar and SSO, eastward for mid-inclination LEO.
Every flight, including the two we would rather not show. Each square is one launch, in order.
Customer debriefs
We were given a T-0 when we signed and lifted off eleven seconds after it. Our ops team stopped building slack into every plan.
The interface document was eleven pages. Our previous provider sent ninety. Nothing that mattered was missing from the eleven.
Our students integrated a 3U on a Tuesday and had first telemetry on Thursday morning. That is the whole review.
212 people, one building and two pads. We hire engineers who would rather fly the same rocket forty times than draw a new one.
Relocation to Wellington supported. Roles open to applicants with the right to work in New Zealand.
A mission manager replies within one working day with a slot, a T-0 and a draft contract.
Questions, answered
Your launch date is fixed at contract, not at integration. We publish a T-0 to the minute; across the last 38 flights the mean deviation from that minute was 11 seconds. If we slip a flight for vehicle reasons, the re-flight is at our cost and your slot moves to the next pad turnaround, nine days later.
Yes, up to L–60 days, between any two flights with open capacity. Moving from LEO to SSO is re-priced at the SSO rate; moving down costs nothing.
3U to 16U CubeSat dispensers, and 8″, 15″ and 24″ separation rings for ESPA-class and microsat buses. The Tern adapter is a Ø937 mm interface; everything else is a plate.
Apsis Launch holds the operator licence and handles range, airspace and maritime notices. You remain responsible for your spacecraft’s own payload permit; we provide the mission data that application needs.
Launch and first-30-days in-orbit cover is available as a pass-through at 4.8% of declared value. Most customers take it; it is never bundled by default.