Iron-airMulti-day storage · Engineered and built in Austin, Texas
100 hours of storage.
Iron, air, water.
Ampery stores electricity by rusting iron and un-rusting it again. Our strings soak up the midday solar surplus, carry the evening peak, and keep going through the windless week that lithium was never priced to cover.
- duration
- 100 h
- per kWh, installed
- $21
- flammable parts
- 0
- design life
- 20 yr
Live model · Pecos Hub · 13:30 CT
Charging- MW in
- 300MW
- MW out
- 0MW
- State of charge
- 54.2%
- Stored
- 16.25GWh
A day on the grid
The sun clocks out at 6:42. Your load doesn’t.
This is a modelled October Tuesday in a 60 GW Texas load zone. Solar hollows out the middle of the day; the evening ramp climbs 30 GW in four hours. Drag the clock and watch Pecos Hub buy the glut and sell the ramp, 300 MW at a time.
13:30
Charging- Zone net load
- 25.3GW
- Zone demand
- 49.2GW
- MW in
- 300MW
- MW out
- 0MW
String fill · A1–D6 · site SOC 54.2%
Dispatch follows a price signal, not a timer. The site buys the midday glut at the bottom of the duck and sells it back across the evening ramp, then holds the rest for the week the wind stops.
- GWh under contract
- 106.8
- MW in commercial operation
- 420
- sites across six states
- 7
- thermal events, ever
- 0
Under contract with
- Redmesa Power Cooperative
- Tallgrass Public Utility District
- Bluestem Municipal Light
- Sandhill Grid Authority
- Northfork Public Power
- Mesquite Flats Energy
- Coldwater Prairie Electric
The chemistry
We rust iron on purpose. Then we reverse it.
Iron-air is the oldest idea in electrochemistry made cheap enough to matter. Three steps, two reactions, one metal you can buy by the trainload.
- Step AFe + ½O₂ + H₂O → Fe(OH)₂
Discharge: breathe in.
Each cell holds a bed of iron pellets in a water-based electrolyte. Air is drawn across the cathode, the iron takes oxygen and oxidises. That reaction gives up electrons, and those electrons are your megawatts.
- Step BFe(OH)₂ → Fe + ½O₂ + H₂O
Charge: breathe out.
Push surplus midday current back in and the reaction runs in reverse. Oxygen is released to the atmosphere and the rust returns to metallic iron, ready for the next cycle. No fuel, no combustion, no exhaust.
- Step Cself-discharge < 0.8 % / day
Hold: as long as you need.
Iron is patient. A charged string loses less than one percent per day, so the same enclosure that shaves tonight’s peak can carry a four-day winter low with no wind and almost no sun.
One enclosure, by the numbers
Each block in the site drawing is a string of 384 of these.
- Enclosure
- 14.6 × 2.5 × 2.9 m, steel
- Power
- 32.5 kW
- Energy
- 3.25 MWh
- Duration
- 100 h at rated power
- Round-trip efficiency
- 42 % AC–AC
- Operating range
- −30 °C to +48 °C ambient
- Design life
- 20 years, no augmentation
- Mass
- 36 t, 94 % recyclable steel and iron
Cost per kWh
A tenth of the price per stored kilowatt-hour.
At four hours, lithium is unbeatable. At a hundred, you are paying for twenty-five batteries to do one job. Iron costs about as much per tonne as gravel did in 1980.
Ampery iron-air
100 h, energy component
$21Compressed air (cavern)
site-dependent
$96Pumped hydro
new-build, greenfield
$118Lithium-ion, stacked to 100 h
LFP, 4 h blocks
$186Vanadium flow
electrolyte-limited
$274
Ampery estimates for systems reaching commercial operation in 2026–27, energy component only, excluding interconnection and land. Alternative technologies use mid-range public cost assumptions scaled to 100 hours. Illustrative; not an offer.
Deployments
Seven sites. Every one on time, so far.
Public power, co-ops and municipal utilities came first, because they plan in decades and pay for firm capacity, not for headlines.
| Site | Utility | Location | Power | Energy | Status | COD |
|---|---|---|---|---|---|---|
| Pecos Hub | Redmesa Power Cooperative | Reeves Co., TX | 300 MW | 30,000 MWh | Operating | 2025 |
| Tallgrass Ridge | Tallgrass Public Utility District | Finney Co., KS | 120 MW | 12,000 MWh | Operating | 2025 |
| Bluestem One | Bluestem Municipal Light | Cass Co., ND | 48 MW | 4,800 MWh | Commissioning | Q4 2026 |
| Sandhill Firming | Sandhill Grid Authority | Cherry Co., NE | 200 MW | 20,000 MWh | Construction | 2027 |
| Northfork Winter Reserve | Northfork Public Power | Lewis and Clark Co., MT | 90 MW | 9,000 MWh | Construction | 2027 |
| Mesquite Flats | Mesquite Flats Energy | Luna Co., NM | 250 MW | 25,000 MWh | Contracted | 2028 |
| Coldwater Prairie | Coldwater Prairie Electric | Comanche Co., KS | 60 MW | 6,000 MWh | Contracted | 2028 |
| Total contracted | 1,068 MW | 106,800 MWh | all 100-hour systems | |||
Safety and materials
Boring on purpose. Safe by chemistry, not by software.
We don’t manage a fire risk. We engineered it out. What’s left is a steel box of iron and salt water that a county inspector can understand in one visit.
Bill of materials · by mass · per enclosure
- 38%Iron pellets
- 31%Steel enclosure & frame
- 19%Water + KOH electrolyte
- 7%Polymer separators
- 5%Copper & controls
- 01
Nothing in the box can burn.
The electrolyte is mostly water. There is no flammable solvent, no thermal-runaway pathway and no off-gas that needs a deflagration vent. Our sites carry no fire suppression system because there is nothing for one to do.
- 02
No lithium, cobalt or nickel.
The active material is iron, the fourth most abundant element in the crust. Our pellets are made from domestic ore concentrate in Texas. No critical-mineral exposure, no single-country supply chain.
- 03
Steel in, steel out.
At end of life an enclosure goes to an ordinary scrap yard. Ninety-four percent of its mass re-enters the steel cycle; the electrolyte is neutralised on site and discharged as salt water under permit.
- 04
Built to be abused.
Every enclosure design is nail-penetrated, flooded to the roofline, cold-soaked at −40 °C and set in an external pool fire for sixty minutes at our Bastrop test yard. Results are in the data room, unredacted.
From the control room
“February brought four days of ice and no wind. Pecos Hub ran eighty-one hours straight and nobody in our control room raised their voice.”
Dolores Achterberg
VP System Operations, Redmesa Power Cooperative
“The procurement memo was one page. Iron, air, water, and a price per kilowatt-hour that our board asked to see twice.”
Marcus Oyelaran
Director of Resource Planning, Tallgrass PUD
“Our fire chief walked the site, asked where the suppression system was, and laughed when we told him.”
Ingrid Valtonen
General Manager, Bluestem Municipal Light
Utility partners
Bring us your hardest hour.
Send an 8,760-hour load and resource file. We send back a dispatch model, a site layout and a fixed price, not a brochure.
- Day 0You share an 8760 file and your interconnection queue position.
- Day 10We return a dispatch model against your actual weather years.
- Day 30Site walk, layout, and a fixed-price term sheet with guarantees.
Straight answers.
The questions planners ask in the first meeting.
42 % round-trip efficiency sounds low. Why should a utility care?
Because at 100 hours the expensive part is the energy, not the losses. You are charging on midday power that frequently clears below zero. Paying for eleven cents of storage per kilowatt-hour stored beats paying for a hundred and eighty.
How long from signed contract to commercial operation?
Typically 18 to 26 months, gated by interconnection, not by us. Enclosures ship from Austin on standard flatbeds and a 100 MW string set installs in about eleven weeks on a compacted gravel pad.
How much land does it take?
Roughly four acres per gigawatt-hour including setbacks and access roads. Enclosures stack two high where local code allows, which halves that.
Does it work in extreme cold or heat?
Yes. The electrolyte is held in range by the cell’s own reaction heat plus a small resistive loop. Northfork Winter Reserve is designed for a −38 °C ambient and Mesquite Flats for +48 °C.
What do you guarantee?
Capacity, availability and round-trip efficiency, under a 20-year long-term service agreement with liquidated damages. We publish the guarantee schedule in every term sheet; it is not negotiated down after award.
Can Ampery sit next to an existing lithium or gas fleet?
That is the most common configuration. Lithium handles the sub-hour work, Ampery handles the days. Our plant controller speaks DNP3 and IEC 61850 and dispatches alongside your existing EMS.