VLAKTE HYDROGEN · Green hydrogen developer, 40 staff · Lüderitz
How a Lüderitz green hydrogen developer became the source AI assistants quote
71%
of sampled AI answers now cite the developer’s own pages
Lüderitz, Namibia · 18 months · Industry, energy & mobility
- Own-page citations
- 71%
- Fact conflicts
- 0
- Explainers live
- 24
01THE CHALLENGE
The facts existed. They just didn’t agree.
Investors asking AI assistants about Namibian green hydrogen got answers from an outdated government PDF, while the developer’s own facts disagreed page to page.
Vlakte Hydrogen’s first phase had been redesigned twice since a 2021 government feasibility study. Each redesign left a trace: a press release here, a conference deck there, an investor FAQ nobody updated. When a fund analyst or a journalist asked an AI assistant about green hydrogen in Lüderitz, the assistant reached for the one document that looked stable and official: the old government PDF.
The fix was not louder marketing. It was one set of project facts, stated identically everywhere, and explainers clear enough that an assistant would rather quote them.
INSPECTION SHEET · MONTH 0
37
01Fact conflicts
Across 58 web pages and 11 PDFs, capacity, site, timeline and partners were stated 37 different ways.
7
02Capacity figures
Phase 1 was 250 MW on the home page, 0.3 GW in the press kit and “up to 400 MW” in the investor FAQ.
62%
03Answers quoting a 2021 PDF
Of 120 investor- and press-style prompts sampled across AI assistants, 62% cited the government feasibility study, which predates both redesigns.
0
04Pages with structured data
No Organization or Project markup and no sameAs links: nothing tied the site, the registry entry and the press coverage to one entity.
3
05Spellings of Lüderitz
Lüderitz, Luderitz and Luederitz split the site name across pages, maps listings and partner sites.
14
06Months since the last update
The newsroom’s latest post was 14 months old. Assistants had nothing newer from the developer to prefer.
02TRY IT · ENTITY PANEL BUILDER
Connect the facts, change the answer.
Each row is one project fact as four of the developer’s own pages stated it before the work. Connect a fact to make it identical everywhere and mark it up as structured data, then watch the modelled AI answer switch from stale sources to the developer’s own.
WHERE EACH FACT IS STATED
0 of 4 facts connected
- 01Capacity3 conflicts
- Home page250 MW
- Project page320 MW, phase 1
- Investor FAQup to 400 MW
- Press kit0.3 GW
- 02Site3 conflicts
- Home pageLüderitz harbour
- Project page22 km east of Lüderitz port
- Investor FAQLüderitz Peninsula
- Press kitsouthern Namibia
- 03Timeline2 conflicts
- Home pagefirst hydrogen 2026
- Project pageFID 2027 · first hydrogen 2030
- Investor FAQproduction from 2028
- Press kitFID 2027 · first hydrogen 2030
- 04Partners3 conflicts
- Home page3 partners
- Project pageBenguela Port, Nordwind, Tsamma
- Investor FAQBenguela Port, Kalahari Solar
- Press kitnot listed
ENTITY PANEL
Vlakte Hydrogen
vlaktehydrogen.example
Vlakte Hydrogen · one entity, Organization + Project markup
No facts connected yet. The panel fills as you connect them.
MODELLED AI ANSWER
“What is Vlakte Hydrogen building in Namibia, and when?”
Vlakte Hydrogen is a green hydrogen developer based in Lüderitz, Namibia. Its plant is planned at 500 MW.[1] It is sited at Lüderitz harbour.[2] Production was expected to begin in 2026.[1] Its partners include Benguela Port and Kalahari Solar.[3]
SOURCES CITED
- [1]2021 government feasibility PDFstale
- [2]2022 regional news articlestale
- [3]2022 investor-forum slidesstale
0 of 4 facts connected. 9% of modelled answers cite the developer’s own pages.
Modelled: the share comes from the scenario’s monthly sample of 120 prompts, not from a live assistant.
03THE CURRENT APPLIED
Facts first, then the explainers.
The engagement ran on our Content Engine plan: content written for people and for the assistants they ask, starting with the facts and only then the words around them.
01 · ENTITY FACT SHEET
37 conflicts → 0One dated source of project facts
Capacity, site, timeline and partners agreed with engineering and legal, versioned and dated. Every page, PDF and partner profile now quotes it word for word.
02 · EXPLAINER LIBRARY
24 explainersExplainers an assistant would quote
Plain-language explainers on how the plant works, where the water comes from, what the port needs and what an investment decision means. Each opens with a two-sentence answer and dated figures.
03 · STRUCTURED DATA
58 pages marked upFacts a machine can read
Organization and Project markup, sameAs links to the company registry and partner pages, one spelling of Lüderitz and a dated changelog on every fact.
04 · AI ANSWER MONITORING
120 prompts a monthWatching what assistants say
Every month the same 120 investor and press prompts were run across AI assistants and each citation logged. Wrong answers decided which explainer to write next.
04CELL LOG
Eighteen months, one bubble at a time.
- MONTH 1
Prompt baseline
120 investor and press prompts run across AI assistants, every citation logged. 62% lead to the 2021 PDF.
Own-page share9% - MONTH 2
Fact inventory
Every statement of capacity, site, timeline and partners found across 58 pages and 11 PDFs: 37 conflicts.
Own-page share9% - MONTH 3
The fact sheet
Engineering and legal sign off one dated set of facts. The first explainer, on phase 1 capacity, goes live.
Own-page share11% - MONTH 4
Pages aligned
Home, project, FAQ and press kit rewritten to the fact sheet. Old PDFs carry a dated notice pointing to the current page.
Own-page share14% - MONTH 5
Structured data
Organization and Project markup, with sameAs links to the registry and the partner pages.
Own-page share18% - MONTH 6
The water question
Where the desalinated water comes from and how much the plant needs: two sentences first, then the detail.
Own-page share23% - MONTH 7
Port and export
How hydrogen and ammonia would leave Lüderitz. Two trade titles cite the explainer.
Own-page share28% - MONTH 8
Last conflict closed
A partner site corrects its capacity figure. Conflicts reach zero and stay there.
Own-page share33% - MONTH 9
FID explained
What a final investment decision is and what it depends on, for analysts new to the sector.
Own-page share38% - MONTH 10
Newsroom restarted
Dated monthly project updates, so assistants have something newer than 2021 to prefer.
Own-page share43% - MONTH 11
Glossary
Electrolyser, green ammonia, offtake: short definitions linked from every explainer.
Own-page share48% - MONTH 12
Half-way review
Own-page citations pass half of sampled answers. Most stale answers left are about jobs.
Own-page share53% - MONTH 13
Jobs and skills
Local hiring and training explained: the most-asked question still answered from old sources.
Own-page share57% - MONTH 14
Community questions
Land, water and tourism in plain words, written with the town council’s questions in hand.
Own-page share61% - MONTH 15
Press kit rebuilt
An HTML press kit replaces the PDF. Every figure links to its fact-sheet entry.
Own-page share64% - MONTH 16
Investor FAQ, second edition
Twelve analyst questions answered with dated figures and the source of each.
Own-page share67% - MONTH 17
Refresh cycle
Every explainer re-checked against the fact sheet. Dates updated; nothing contradicts.
Own-page share69% - MONTH 18
Reckoning
71% of sampled answers cite the developer’s own pages; organic visits to investor and press pages up 164%.
Own-page share71%
05READINGS AT MONTH 18
The answers now come from the source.
9% → 71%
37 → 0
24
+164%
Modelled scenario for a fictional business — not a client result. Rankings, traffic and AI citations are never guaranteed; see our Terms.
ANSWER AUDIT · WHO GETS CITED
| Prompt, as typed | Cited at month 0 | Cited at month 18 |
|---|---|---|
| green hydrogen projects Lüderitz Namibia | 2021 government feasibility PDF | vlaktehydrogen.example/project |
| Vlakte Hydrogen capacity MW | 2021 government feasibility PDF | vlaktehydrogen.example/project |
| when will Vlakte Hydrogen start production | 2021 government feasibility PDF | vlaktehydrogen.example/project/timeline |
| Vlakte Hydrogen partners | 2022 investor-forum slides | vlaktehydrogen.example/partners |
| Lüderitz hydrogen desalination water use | 2022 regional news article | vlaktehydrogen.example/explainers/water |
| Namibia green ammonia export port | 2022 regional news article | vlaktehydrogen.example/explainers/port |
YOUR FACTS, YOUR ANSWERS
Get a plan like this
One consistent set of facts, and explainers clear enough that assistants quote you rather than a five-year-old PDF.
← Back to all case studies