Kaizu Robotics · Collaborative robot integrator · Nagoya
How a Nagoya cobot integrator answered manufacturers' automation questions before sales could
+190%qualified leads in 14 months
- CITY
- Nagoya
- REGION
- Asia-Pacific
- PLAN
- Content Engine
- CYCLE
- 14 mo
01 · The challenge
Buyers finished their research before Kaizu knew they existed.
Plant managers researched automation ROI alone for months, and the integrator showed up only once they were already talking to competitors.
Automation is a slow, private decision. A plant manager at a Tier-2 supplier in Aichi spends months working out whether a cobot will pay back on a palletising cell or a CNC line — reading guides, watching commissioning videos and, increasingly, asking AI search. Kaizu had the engineering answers, but they lived in engineers’ heads, scanned PDFs and untitled YouTube uploads.
By the time a request for quote arrived, the shortlist was set. Sales was answering questions a competitor’s blog had answered half a year earlier.
Modelled buyer journey · 7 months of research
02 · Diagnosis
Eight fault codes in the content cell.
4 HIGH · 4 MED · 0 PASS
- E-01Content · High
Organised by robot model, not by job
Every page was a product page (arm, payload, reach). Zero pages for palletising, machine tending, welding or screwdriving — the words plant managers actually search.
- E-02Content · High
ROI questions left unanswered
No page targeted cost, payback or cycle-time queries. The one price sheet was a gated PDF, so the research phase happened on competitors' sites.
- E-03Video · High
63 commissioning videos, invisible
Default titles like "IMG_0412", no chapters, no transcripts, embedded nowhere on the site and no VideoObject markup.
- E-04AI Overviews · High
Cited in 0 of 120 tracked answers
Competitors were cited in 37 AI Overview answers for automation questions. Kaizu had no extractable definitions, tables or step lists to quote.
- E-05Technical · Med
Case studies locked in scanned PDFs
11 project write-ups as image-only PDFs: no indexable text, no internal links, no dates.
- E-06International · Med
JP and EN pages competing
Machine-translated English duplicates with no hreflang, so Japanese pages lost to their own copies in mixed-language results.
- E-07Architecture · Med
A blog with no wiring
38 posts averaging 0.4 internal links in. No hub pages, so authority never pooled around a topic.
- E-08Local · Med
Wrong category in Aichi
Business profile listed as "Machinery supplier", missing the Chubu-region integrator searches that convert fastest.
03 · The program
Answer every automation question first, in the format each one is asked.
Built on our Content Engine plan: a question map turned into job-based clusters, guides engineers sign off, videos that rank in their own right and answer blocks AI search can cite. Four instructions, run in order.
001 MOVJ
Topic clusters
Six clusters built around the jobs cobots do, each with a hub page that answers the buyer's first question and links down to every deeper guide.
- › 6 hubs · 52 spokes
- › Hub → spoke → case study linking
- › JP-first, EN with hreflang
002 MOVL
Application guides
Long-form guides per application: cycle times, payload maths, floor-space drawings, safety assessment and a payback calculator worked through with real line numbers.
- › Payback tables per application
- › Downloadable layout drawings
- › Reviewed by the lead engineer
003 MOVC
Video SEO
The commissioning footage re-cut into short answers, retitled to the query, chaptered, transcribed and embedded in the guide it explains, with VideoObject markup and key moments.
- › 63 videos retitled & chaptered
- › Transcripts on-page
- › Key-moment timestamps
004 WELD
AI Overviews
Every guide opens with a two-sentence definition, a comparison table and numbered steps — the shapes answer engines lift and cite — plus author and review dates.
- › 120 questions tracked weekly
- › Definition + table + steps blocks
- › Entity-consistent naming
cobot palletizing ROI
Month 0- 1Competitor A — Cobot payback explained
- 2Forum — Is a cobot worth it?
- 3Competitor B — Palletiser ROI
cobot palletizing ROI
Month 14- 1AI Overview — cites Kaizu Robotics
- 2Kaizu — Cobot palletising ROI guide
- 3Kaizu — Video: 9-second cycle demo
04 · Trajectory
14 waypoints, one continuous path.
P01Calibrate
Audit & question map
1,240 buyer questions mined from sales calls, RFQs and forums.
P02Calibrate
Cluster design
Six job-based hubs signed off with engineering and sales.
P03Build
First two hubs live
Palletising and ROI hubs, hreflang and JP/EN cleanup.
P04Build
Video retitling sprint
63 videos chaptered, transcribed and embedded.
P05Build
Payback calculator
Shipped inside the palletising guide; first top-5 rankings.
P06Build
PDFs to pages
11 scanned case studies rebuilt as indexable, linked pages.
P07Answer
AI Overview blocks
Definition, table and steps pattern applied site-wide.
P08Answer
Machine tending hub
Cycle-time guide plus 9 short answer videos.
P09Answer
First AI citations
Cited in 14 tracked answers; leads attributed via forms.
P10Answer
Welding hub
Manual-vs-cobot cost comparison becomes top traffic page.
P11Compound
Inspection & screwdriving
Final two hubs complete the six-cluster map.
P12Compound
Refresh cycle
Top 20 guides updated with new line data.
P13Compound
Sales enablement
Guides linked from every proposal and trade-show QR code.
P14Compound
Steady state
44 guides top-5; 61 qualified leads in the trailing quarter.
05 · Output
Welded into place.
Modelled scenario for a fictional business — not a client result. Rankings and traffic are never guaranteed; see our Terms.
Qualified leads / quarter
2161
Trailing 3-month qualified leads, modelled
Guides ranking top-5
044
Guides ranking in positions 1–5, modelled
Video views from search / month
2k38k
Search-driven video views per month, modelled
Rankings by query
A sample of the tracked buyer questions in Japanese and English. Filter by the cluster that answers them.
| Query | Cluster | Before | After | Ranking page |
|---|---|---|---|---|
| cobot palletizing ROI | ROI & safety | >100 | #2 | Guide + calculator |
| 協働ロボット 導入 費用cobot installation cost | ROI & safety | 64 | #1 | Guide |
| machine tending cobot cycle time | Machine tending | >100 | #3 | Guide + video |
| cobot welding vs manual welding cost | Welding | 88 | #2 | Comparison |
| 協働ロボット 溶接 事例cobot welding case study | Welding | 41 | #4 | Case study |
| ISO/TS 15066 risk assessment cobot | ROI & safety | >100 | #5 | Checklist |
| cobot screwdriving application | Screwdriving | >100 | #3 | Guide + video |
| how long does cobot integration take | ROI & safety | >100 | #1 | AI Overview cited |
| vision inspection cobot automotive | Inspection | 73 | #4 | Guide |
| palletizer cobot floor space | Palletising | >100 | #2 | Drawing + guide |
| CNC machine tending robot payback | Machine tending | 57 | #3 | Calculator |
| 愛知 協働ロボット インテグレーターAichi cobot integrator | ROI & safety | 18 | #1 | Local + hub |
END · PROGRAM COMPLETE
Get a plan like this
If your buyers research for months before they call, Content Engine puts your answers in front of them first.