Illustrative case study

A fictional business. The figures are a modelled scenario, not a client result.

SEO case study · Local

Tallowmere Forge

Structural steel fabricator · Sheffield, UK & Ireland

How a Sheffield steel fabricator won the South Yorkshire contractor searches

+3.4x

tender enquiries · in 12 months

TALLOWMERE

The challenge

Good steel.
Invisible on the map.

Contractors searched for local fabricators, but the firm's site had no project pages and its profile listed the wrong category.

Main contractors across South Yorkshire search the way they buy: “structural steel Sheffield”, “mezzanine installer Rotherham”, “steel fabricators near me”, often from a site cabin on a phone. They shortlist from the map pack and then check one thing: has this firm built something like ours?

Tallowmere Forge had twenty years of frames, mezzanines and staircases behind it, but Google filed the business as a blacksmith and the website showed a single unlabelled gallery. Tenders came by word of mouth, about five a month, and stalled whenever a regular client went quiet.

Assay · the audit

Six faults found in the metal

  • L-01 · Localcritical

    Wrong primary category

    Profile listed as “Blacksmith”, so it was filtered out of every “steel fabricator” and “structural steel” map-pack query.

  • C-01 · Contentcritical

    No project evidence

    Zero project pages. Contractors vet fabricators on comparable jobs; the site offered one gallery of 12 untitled photos.

  • L-02 · Localhigh

    Split NAP footprint

    Three addresses (old unit, new unit, director’s home) across 37 listings, plus 9 duplicates diluting prominence.

  • T-01 · Technicalhigh

    No structured data

    No LocalBusiness, no areaServed, no service markup; Google could not tie the site to the profile with confidence.

  • C-02 · Contentmedium

    One page for every service

    Fabrication, erection, mezzanines and staircases shared a single “Services” page with 180 words.

  • T-02 · Technicalmedium

    Slow mobile pages

    Uncompressed 6 MB gallery images pushed mobile LCP to 4.8s on the pages contractors open on site.

“steel fabricators sheffield” · map pack

Before · month 0

  1. ADon Valley SteelworksSteel fabricator · 4.6 ★
  2. BNorthern Beam & PlateSteel fabricator · 4.4 ★
  3. CAttercliffe FabricationsSteel fabricator · 4.2 ★

Tallowmere Forge: not shown. Listed under “Blacksmith”.

After · month 12

  1. ATallowmere ForgeSteel fabricator · 4.9 ★ · 38 reviews
  2. BDon Valley SteelworksSteel fabricator · 4.4 ★
  3. CNorthern Beam & PlateSteel fabricator · 4.2 ★

Illustrative mock-up; competitor names are fictional.

Melt · the strategy

Four alloys, one pour

Built on our Local plan: fix the profile so the business qualifies for the map pack, then give Google and contractors the same proof: real projects, consistent citations, clean structured data.

  1. GBP

    Google Business Profile

    Re-categorised the profile so it can enter the map pack for fabrication searches at all, then kept it alive with site photos.

    • Primary: Steel fabricator; secondary: Steel erector, Metal fabricator
    • Services for frames, mezzanines, staircases, canopies
    • Weekly photos and fortnightly posts from live jobs
  2. PRJ

    Project case-study pages

    One page per completed job: the evidence contractors and estimators look for before they invite a fabricator to tender.

    • Tonnage, grade, execution class, programme
    • Town and sector in the title and URL
    • Hub pages per service and per town
  3. NAP

    Local citations

    One name, address and phone across the web, and listings in trade-specific directories that contractors actually use.

    • 37 listings reconciled, 9 duplicates merged
    • Construction and supplier-register listings
    • Regional chamber and trade body profiles
  4. SCH

    LocalBusiness schema

    Structured data that ties the website, the profile and the service area together unambiguously.

    • LocalBusiness with geo, openingHours, areaServed
    • Service and Project markup per page
    • sameAs links to the profile and citations

Pour · month by month

12 months on the shop floor

Select a month (arrow keys work) to see what shipped and where the numbers stood.

Month 1 of 12 · Assay

Audit and category fix

Full local, technical and content audit. Primary Google Business Profile category corrected from “Blacksmith” to “Steel fabricator”, with “Structural engineer” services removed and “Steel erector” added.

Tender enquiries
5
Map-pack top-3
2
Organic sessions
700

Cast · the results

+3.4x tender enquiries

Each figure is poured hot, then cooled to steel once it is set. Month 0 versus month 12.

  • 01 · Map-pack top-3 terms

    Map-pack top-3 terms: from 2 to 19.

    Ladle ready

  • 02 · Tender enquiries / month

    Tender enquiries / month: from 5 to 17.

    Ladle ready

  • 03 · Organic sessions / month

    Organic sessions / month: from 700 to 2,600.

    Ladle ready

Modelled scenario for a fictional business — not a client result. Rankings and traffic are never guaranteed; see our Terms.

Tender enquiries per month · modelled
051015205M15M26M37M48M59M611M712M813M915M1016M1117M12
Organic sessions per month · modelled
0k1k2k3k2,600M1M12

Ranking ledger · Google, South Yorkshire

Modelled rankings before and after for ten target searches
Search termVol / moBeforeAfterMap pack
steel fabricators sheffield590141● Top 3
structural steel sheffield32092● Top 3
steel fabrication near me1,90020+3● Top 3
mezzanine floor installers south yorkshire14020+1● Top 3
steel staircase fabricator rotherham7020+2● Top 3
steel frame building barnsley110183● Top 3
structural steelwork contractor doncaster9020+2● Top 3
steel beams supplied and fitted sheffield21031● Top 3
metal canopy fabrication yorkshire5020+4○ Organic
steel erectors sheffield17021● Top 3

Quench

Get a plan like this

A Local SEO engagement for trades and manufacturers who win work from the map pack.

← All case studies